Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 07, 2026 - 10:30 PST
Scheduled
ITS has scheduled the following maintenance:
When: Wednesday 1/7/2026 from 10:30am to 4pm
Message Currently adcom-row-1-1-9k1 and adcom-row-1-1-9k2 are installed in the same rack, and connected to the same electrical circuit. An outage on that circuit would cause both of those switches (that are a VPC pair) to go down. Moving adcom-row-1-1-9k1 to a different rack (on a different electrical circuit) will significantly reduce the risk of both switches going down at the same time. The Security, mainframe backup and printer connections on adcom-row-1-1-9k1 are shown below. Those same connections are also on adcom-row-1-1-9k2 (which is not being moved).
Eth1/6 eth 10G NEW-Fortianalyzer-traffic Eth1/8 eth 10G FORTINET-SANDBOX-TRAFFIC Eth1/9 eth 10G FORTIMANAGER-TRAFFIC Eth1/12 eth 10G FiberSan1_DATA Eth1/13 eth 1000 Fibersan1_MGMT Eth1/14 eth 1000 mainframe-mf-minolta-printer
Please contact ITS Service Desk at (858)246-HELP(4357) or servicedesk@ucsd.edu if you have any questions or concerns.