Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 13, 2019 - 07:00 PDT
Scheduled
ITS Datacom Team, ITS I&R Team, and ITS Network Monitoring Team have scheduled the following network maintenance.
WHAT: Power reset and reload of Switch 3 of device a-erc-admin-5-1-3850-stk WHEN: Tuesday Aug 13, 2019 at 7 AM SCOPE: I&R Team will perform a power reset and reload of Switch 3 to eliminate a false reading coming from the switch. IMPACT: Loss of wired and wireless connectivity to devices connected to Switch 3 for a duration of approximately 30 minutes.