Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 16, 2025 - 03:00 PDT
Scheduled
Datacom/Netmon has scheduled the following maintenance:
What: Reload network switch sio-igpp-munk-0-1-flr3-c9300-stk When: Wednesday April 16, 2025 between 3 AM and 5:30 AM Scope: reload the switch to upgrade the IOS software code from an old version to the current standard software code. Impact: Loss of wired and wireless connections to network switch sio-igpp-munk-0-1-flr3-c9300-stk for approx 30 minutes. The switch is located at igpp sio munk lab.