Network Maintenance: reload distribution switch  v-stein-0-1-9500-dist on Wednesday, Feb 25, 2026 between 3 AM and 5:30 AM

Scheduled Maintenance Report for ITS Network & Systems

Completed

The scheduled maintenance has been completed.
Posted Feb 25, 2026 - 05:30 PST

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Feb 25, 2026 - 03:00 PST

Scheduled

Datacom has requested the following network maintenance:

What: reload distribution switch  v-stein-0-1-9500-dist.
When: Wednesday, Feb 25, 2026 between 3 AM and 5:30 AM
Scope: reload and update the IOS software version on the switch from an outdated version to the current standard code version.
Impact: loss of wired and wireless connection to the distribution switch and the edge switches connected to it for approx 30 minutes.
Below are the edge switches connected to the distribution switch:
 
Name:    v-stein-4-1-9300-stk

Name:    v-stein-3-2-9300-48

Name:    v-stein-0-1-9300-48

Name:    v-stein-2-2-9300-48

Name:    v-stein-1-1-9300-48

Name:    v-stein-1-2-9300-48

Name:    v-stein-3-1-9300-48

Name:    v-stein-0-2-9300-48

Name:    v-stein-2-1-9300-48

The distribution switch is located at  Stein 0.1 Telecommunications Room.
Posted Feb 20, 2026 - 11:31 PST
This scheduled maintenance affected: Network.