Network Maintenance: reload network switch a-wells-frg-hall-5-1-c9300-48 on Tuesday, Nov 10, 2026 between 3 AM and 5:30 AM

Scheduled for Nov 10, 03:00 - 05:30 PST

Scheduled

Datacom/Netmon has scheduled the following network maintenance:

What: reload network switch a-wells-frg-hall-5-1-c9300-48
When: Tuesday, Nov 10, 2026 between 3 AM and 5:30 AM
Scope: reload the switch to upgrade the IOS software code to the current standard code to resolve errors occurring on the switch.
Impact: loss of wired and wireless network connectivity to the switch for approx 30 minutes.
The switch is located at Wells Fargo Hall TR5.1.
Posted Nov 05, 2026 - 10:29 PST
This scheduled maintenance affects: Network.