Network Maintenance: Reload network switch m-mayer-hall-5-3-9300-stk on Thursday, April 24, 2025 between 3 AM and 5:30 AM
Scheduled for Apr 24, 03:00 - 05:30 PDT
Scheduled
Datacom/Netmon has scheduled the following maintenance:
What: Reload network switch m-mayer-hall-5-3-9300-stk When: Thursday, April 24, 2025 between 3 AM and 5:30 AM Scope: reload the switch to upgrade the IOS software code from an older version to the current standard code. Impact: Loss of wired and wireless connections to network switch m-mayer-hall-5-3-9300-stk for approx 30 minutes. The switch is located at Mayer Hall TR 5.3 5th floor.