IT Services will be performing a Node-B and Node-M Core Router IOS upgrade to address bugs
The primary network path will then be taken down briefly, while the secondary network path through Node-B will remain active and passing all traffic including spanned VLANs to/from SDSC and TPCS during this window. During both windows, connectivity to Health Sciences will experience brief disconnects.