Network Maintenance: Reload network switch sio-igpp-munk-0-1-flr2-c9300-stk on Tuesday, Nov 19, 2024 between 3 AM and 5:30 AM
Scheduled Maintenance Report for ITS Network & Systems
Completed
The scheduled maintenance has been completed.
Posted Nov 19, 2024 - 05:30 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Nov 19, 2024 - 03:00 PST
Scheduled
Datacom/Netmon has scheduled the following maintenance:

What: Reload network switch sio-igpp-munk-0-1-flr2-c9300-stk
When: Tuesday, Nov 19, 2024 between 3 AM and 5:30 AM
Scope: reload the switch to upgrade the IOS software code from an outdated code to the current standard code.
Impact: Loss of wired and wireless connections to network switch sio-igpp-munk-0-1-flr2-c9300-stk for approx 30 minutes.
The switch is located at IGPP Munk Lab, SIO Munk 0-1 2nd Floor.
Posted Nov 13, 2024 - 12:27 PST
This scheduled maintenance affected: Network.