Network Maintenance: reload and upgrade network switch a-wells-frg-hall-2-1-c9300-48 on Wednesday, Nov 4, 2026 between 3 AM and 5:30 AM

Scheduled for Nov 4, 03:00 - 05:30 PST

Scheduled

Datacom/Netmon have scheduled the following network maintenance:

What: reload network switch a-wells-frg-hall-2-1-c9300-48

When: Wednesday, Nov 4, 2026 between 3 AM and 5:30 AM

Scope: reload the switch to upgrade it to the current IOS standard software code to resolve errors occurring on the switch.

Impact: loss of wired and wireless network connectivity to the switch for approx 30 minutes.

The switch is located at Wells Fargo Hall TR2.1
Posted Oct 31, 2026 - 08:52 PDT
This scheduled maintenance affects: Network.