Network Maintenance: reload network switches n-rgrf-1-1-9300-stk, n-rgrf-2-1-9300-stk, and n-cnt-3-1-c9300-stk on Thursday, March 12, 2026 between 3 AM and 5:30 AM
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Mar 12, 2026 - 03:00 PDT
Scheduled
Datacom/Netmon has scheduled the following network maintenance:
What: reload network switches n-rgrf-1-1-9300-stk, n-rgrf-2-1-9300-stk, and n-cnt-3-1-c9300-stk. When: Thursday March 12, 2026 between 3 AM and 5:30 AM Scope: reload each switch to upgrade it to the current standard software IOS code. Impact: loss of wired and wireless connectivity to network switches n-rgrf-1-1-9300-stk, n-rgrf-2-1-9300-stk, and n-cnt-3-1-c9300-stk for approx 30 minutes for each switch.
n-rgrf-1-1-9300-stk Location: Shiley RGRF TR 1.1 9405 Campus Pt Dr n-rgrf-2-1-9300-stk Location: Shiley RGRF TR 2.1 9405 Campus Pt Dr n-cnt-3-1-c9300-stk Location: Center for Novell Therapeutics TR3.1