Scheduled Maintenance: reload and upgrade network switch u-laurel-c9300-48 on Wednesday, Feb 18, 2026 between 3 AM and 5:30 AM.
Scheduled for Feb 18, 03:00 - 05:30 PST
Scheduled
Datacom/Netmon have scheduled the following network maintenance:
What: reload network switch u-laurel-c9300-48. When: Wednesday, Feb 18, 2026 between 3 AM and 5:30 AM. Scope: reload the switch to upgrade it from an outdated software code to the current standard code. Impact: Loss of wired and wireless connections to the switch for approx 30 minutes. The switch is located at Evergreen Complex Laurel Trailer.