Network Equipment Updgrade: DB2 Machines
Scheduled Maintenance Report for ITS Network & Systems
Completed
The scheduled maintenance has been completed.
Posted Mar 17, 2018 - 12:00 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Mar 17, 2018 - 09:00 PDT
Scheduled
ITS has scheduled the following network maintenance :

START: 9:00 AM Saturday, March 17, 2018
STOP: 12:00 PM Saturday, March 17, 2018

SCOPE: The network connectivity to the DB2 LUW servers needs to be moved to newer equipment. That is going to affect the connectivity links to the databases (VLAN 2534), as well as the data replication link (VLAN 2536). (See list of buildings below)

IMPACT: The physical connections are completely redundant, and the migration will happen one link at a time, insuring there is no loss of connectivity to the hosts.

Database host list that will be touched:
- cuvier-hadr (QA)
-cuvier (QA)
- lister-had (QA)
- lister (QA)
- hawkins-hadr (QA)
- hawkins (QA)
- bardeen-hadr (PROD)
- Bardeen (PROD)
- lamarck-hadr (PROD)
- Lamarck (PROD)
- galilei-hadr (PROD)
- galilei

Please contact ITS Service Desk at (858)246-HELP(4357) or servicedesk@ucsd.edu if you have any questions or concerns.
Posted Mar 16, 2018 - 07:08 PDT