Network Maintenance: reload network switch n-rad-oncology-9300-stk on Thursday, July 3, 2025 between 3 AM and 5:30 AM

Scheduled for Jul 3, 03:00 - 05:30 PDT

Scheduled

Datacom/Netmon has scheduled the following maintenance:

What: Reload network switch n-rad-oncology-9300-stk
When: Thursday, July 3, 2025 between 3 AM and 5:30 AM
Scope: reload the switch to upgrade the IOS software code to resolve a software bug issue.
Impact: Loss of wired and wireless connections to network switch n-rad-oncology-9300-stk for approx 30 minutes.
The switch is located at Radiation Oncology Trailer East Campus
Posted Jun 28, 2025 - 11:19 PDT
This scheduled maintenance affects: Network.