Network Maintenance: reload network switch n-rad-oncology-9300-stk on Thursday, July 3, 2025 between 3 AM and 5:30 AM
Scheduled for Jul 3, 03:00 - 05:30 PDT
Scheduled
Datacom/Netmon has scheduled the following maintenance:
What: Reload network switch n-rad-oncology-9300-stk When: Thursday, July 3, 2025 between 3 AM and 5:30 AM Scope: reload the switch to upgrade the IOS software code to resolve a software bug issue. Impact: Loss of wired and wireless connections to network switch n-rad-oncology-9300-stk for approx 30 minutes. The switch is located at Radiation Oncology Trailer East Campus