Network Maintenance: reload network switch a-rimac-prod-rm-325-9300-48 on Wednesday April 2, 2025 between 3 AM and 5:30 AM

Scheduled for Apr 2, 03:00 - 05:30 PDT

Scheduled

Datacom/Netmon has scheduled the following maintenance:

What: Reload network switch a-rimac-prod-rm-325-9300-48
When: Wednesday April 2, 2025 between 3 AM and 5:30 AM
Scope: reload the switch to upgrade the IOS software from an old code to the current standard code.
Impact: Loss of wired and wireless connections to network switch a-rimac-prod-rm-325-9300-48 for approx 30 minutes.
The switch is located at the RIMAC Production Office Third Floor.
Posted Mar 25, 2025 - 08:09 PDT
This scheduled maintenance affects: Network.