Network Maintenance: Reload network switches sio-hildebrand-lab-9300-24 and sio-igpp-munk-0-1-flr1-c9300-48 on Tuesday, April 22, 2025 between 3 AM and 5:30 AM
Scheduled for Apr 22, 03:00 - 05:30 PDT
Scheduled
Datacom/Netmon has scheduled the following maintenance:
What: Reload network switches sio-hildebrand-lab-9300-24 and sio-igpp-munk-0-1-flr1-c9300-48 When: Tuesday, April 22, 2025 between 3 AM and 5:30 AM Scope: reload the switches to upgrade the IOS software code from an older version to the current standard software code. Impact: Loss of wired and wireless connections to network switches sio-hildebrand-lab-9300-24 and sio-igpp-munk-0-1-flr1-c9300-48 for approx 30 minutes for each switch. Network switch sio-hildebrand-lab-9300-24 is located at Ritter Hall Room 206. Network switch sio-igpp-munk-0-1-flr1-c9300-48 is located at igpp sio munk lab.