Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 03, 2026 - 03:00 PDT
Scheduled
Datacom/Netmon have scheduled the following network maintenance:
What: reload network switch muir-tamarack-w-3-2-9300-stk When: Wednesday, June 3, 2026 between 3 AM and 5:30 AM Scope: reload and upgrade the switch from an outdated IOS software code to the current standard code. Impact: loss of wired and wireless network connectivity to network switch muir-tamarack-w-3-2-9300-stk for approx 30 minutes. The switch is located at Muir-Tamarack Building #1 3.2 Closet